Barnhart Saves the Day with Overnight Bridge Repair

Market: Heavy Civil Location: Florida Project Dates: 09/22/04 – 10/07/04 The Challenge A truck carrying an excavator met a low bridge and created a traffic nightmare on a Florida interstate. The Solution The Barnhart crew shored-up the bridge with a … Continue reading

Posted in Heavy Civil Construction | Tagged , , , | Leave a comment

Barnhart Uses Tri-Block System to Move Boiler Headers at Tennessee Plant

Market: Power Location: Tennessee Project Dates: 06/2008 – 11/2008 The Challenge Barnhart was tasked to move and replace massive boiler headers through a confined space at a coal-fired power plant.