PROJECTS RESULT IN TWO JOB OF THE YEAR AWARDS

Creative thinking and extensive planning resulted in two 2017 Job of the Year awards for Barnhart from the Specialized Crane and Rigging Association (SC&RA). Barnhart was recognized in the categories of “Rigging Job of the Year Under $150,000” and “Hauling … Continue reading

Posted in Awards, Heavy Haul, Refinery | Tagged , , , , , | Leave a comment

EARLY PLANNING SHORTENS PLANT’S OUTAGE SCHEDULE

Work during outages and shutdowns requires proper planning, management, and innovative solutions to keep overall costs down. A job Barnhart performed at a nuclear power plant exemplifies those standards. Barnhart was hired to remove and replace two feedwater heaters (FWH) … Continue reading

Posted in Nuclear Power, Outages | Tagged , , , , , , , | Leave a comment

BRIDGE REPLACEMENT: ALL IN A WEEKEND’S WORK

When a bridge is replaced on an active highway, time is of the essence. That was the case with a recent Barnhart project for the Connecticut Department of Transportation (CTDOT).  The company was hired to replace both the eastbound and … Continue reading

Posted in Heavy Civil Construction | Tagged , , , , , , , | Leave a comment

Barnhart Saves the Day with Overnight Bridge Repair

Market: Heavy Civil Location: Florida Project Dates: 09/22/04 – 10/07/04 The Challenge A truck carrying an excavator met a low bridge and created a traffic nightmare on a Florida interstate. The Solution The Barnhart crew shored-up the bridge with a … Continue reading

Posted in Heavy Civil Construction | Tagged , , , | Leave a comment