Meredith Portman
ENGINEERING KEY TO R & R PROJECT SUCCESS
A pulp and paper mill in Alabama needed to replace a 28’ long X 8’ diameter, 34,000 lb. deaerator. The unit was…
Bridge Project Utilizes Multiple Cranes and A Cool Tool
Barnhart’s Mount Vernon, Wash. branch recently completed a project that required tapping into their extensive equipment inventory. Barnhart was hired to set…
BARNHART HAULS “SHED ON STEROIDS”
Barnhart is no stranger to handling massive equipment and loads. We’ve erected the structure that held the world’s largest jumbotron and transported…
PROUDLY AMERICAN
Next week, people across the United States will be celebrating July 4th with fireworks, festivities and backyard barbecues galore. For most people,…
Cool Tools and Planning Make Dryer Installation Successful
Barnhart specializes in remove and replace projects. We enjoy the challenge involved in safely extricating a component, which is often buried in a…
VETERANS HELP US FULFILL OUR MISSION
On Memorial Day, we will remember those in the armed forces who gave their lives for our country. We are grateful to…
PROJECTS RESULT IN TWO JOB OF THE YEAR AWARDS
Creative thinking and extensive planning resulted in two 2017 Job of the Year awards for Barnhart from the Specialized Crane and Rigging…
VIDEO LIBRARY SHOWCASES SOME OF BARNHART’S BEST
While Barnhart performs and documents jobs of all sizes, the massive projects involving large equipment and oversize components are often hard to…
MIDWEST BRANCHES ONE-STOP SHOPS
Barnhart’s 32 branches are located all across the country. They include a string of Midwest locations stretching from Chicago to Lincoln, Nebraska…
SHORT NOTICE NO PROBLEM ON R & R JOB
R & R projects, the remove and replace variety, are often challenging, time-sensitive jobs performed during turnarounds and outages. These are the kinds…