Tag Archives: Bridge replacement

WHAT IS AN SPMT?

Acronyms are common in the world of rigging and heavy transport.  You’ll often hear PST, SPMT. What does the alphabet soup of acronyms mean?   A PST is a model of a Goldhofer trailer and generally referred to as a self-propelled … Continue reading

Posted in Heavy Haul | Tagged , , , , | Leave a comment

INTERSTATE BRIDGE WORK COMPLETED AT A RAPID PACE

Barnhart was hired to replace six bridge sections on I-95 in Warwick, Rhode Island. The busy interstate carries over 174,000 cars and trucks a day. To minimize disruption, the DOT used a different, quicker method – a design-build rapid replacement … Continue reading

Posted in Heavy Civil Construction | Tagged , , , | Leave a comment