Engineering Team Shines in Plant Project

Barnhart was hired to remove and replace fuel heat exchangers at a nuclear plant in Wisconsin. The 14,750 lbs. vessels had to be maneuvered in a small space. To overcome the tight tolerances, the engineering team had to design a … Continue reading

Posted in Nuclear Power | Tagged , , , , | Leave a comment

Precise Engineering Results in Minimal Downtime During Outage

Barnhart was recently hired to remove and replace two feedwater heaters at a power plant in Kansas during a planned outage. But it wasn’t going to be easy. The project, which was featured in Cranes Today, had a number of … Continue reading