Tag Archives: water runner

Transport Components 1000 Miles. Repeat.

Barnhart projects often have a long timeframe of at least several months, but in the case of a recently completed project, the timeline was more like six years. As featured in an article in Waterways Journal, the project to deliver … Continue reading

Posted in Heavy Haul, Project Cargo Logistics | Tagged , , , , | Leave a comment

Thousand-Mile Trip Takes Less Than Three Minutes

Barnhart was hired to move a water runner over 1,1000 miles from New Orleans to a hydroelectric facility in Ludington, Michigan. The piece measured 28’ 2” in circumference, was 15’ tall and weighed over 610,000 lbs. The project was captured … Continue reading

Posted in Heavy Haul, Power | Tagged , , , , | Leave a comment