Tag Archives: wind power

Broken Blade Removal A Multi-Branch Effort

When a wind turbine blade breaks, removing it at over 300 feet from the ground can be a challenge. Barnhart was called to a wind farm in Illinois to remove a broken blade from a wind turbine. The other two … Continue reading

Posted in Wind Industry | Tagged , , | Leave a comment

GEARBOX REMOVAL POSES UNUSUAL CHALLENGE

Barnhart was contracted to provide turnkey service for the removal and replacement of five wind turbine gearboxes on 80m hub height wind turbines. The site had several constraints in that the Bureau of Land Management owned the land on which … Continue reading

Posted in Power | Tagged , , | Leave a comment

BARNHART WINS THREE SC&RA JOB OF THE YEAR AWARDS

Barnhart took home three of seven SC&RA Job of the Year Awards at the SC&RA Annual Conference April 14-18 at the La Costa Resort & Spa in Carlsbad, California. The awards recognize projects that successfully meet professional challenges in rigging … Continue reading

Posted in Awards, Heavy Haul, Nuclear Power, Power | Tagged , , , , , , | Leave a comment