Heavy Lift
Innovative Rigging Helps Barnhart Tackle Rooftop Job
Barnhart was hired to install a 15,679-pound chiller through the top of an 11-story building in Little Rock, Ark. In order to…
Steam Locomotive Moved with Care and Precision
Barnhart is often called to move cargo large and small and sometimes even antique. Barnhart’s Spokane branch was hired to move a…
Lock Gate Replacement Becoming a Barnhart Specialty
Barnhart was recently hired for a project at the Holt Lock and Dam on the Black Warrior River in Alabama to remove…
LOAD TESTING HELPS ENSURE PROJECT SAFETY
Load testing of equipment is a critical operation and often a requirement under industry standards. It ensures safety of equipment, and most…
Moving a Package Boiler with Inches to Spare
Barnhart has an extensive video library of equipment demonstrations, projects and case studies. In the video case study below, Barnhart was hired for…
WATERWAYS JOURNAL FEATURES LOCK AND DAM PROJECTS
Barnhart has been busy addressing critical infrastructure needs at waterways across the southeast. Their work on three lock and dam projects, including…
Kentucky Project Enlists Services of Big Al
A project at a lock and dam in Kentucky required Barnhart to bring out the big guns, otherwise known as Big Al….
Bridge Project Utilizes Multiple Cranes and A Cool Tool
Barnhart’s Mount Vernon, Wash. branch recently completed a project that required tapping into their extensive equipment inventory. Barnhart was hired to set…
VIDEO LIBRARY SHOWCASES SOME OF BARNHART’S BEST
While Barnhart performs and documents jobs of all sizes, the massive projects involving large equipment and oversize components are often hard to…
BARNHART DELIVERS COMPONENTS FOR WORLD’S MOST POWERFUL ROCKET
Barnhart Crane & Rigging has been selected by space agency NASA to transport components for its Space Launch System (SLS). SLS will…