-
Don’t Miss a Post
Subscribe to receive an email when we publish new content.
Follow us on Twitter @BarnhartCrane
Barnhart Crane & Rigging on Facebook
Archives
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- January 2017
- December 2016
- November 2016
- October 2016
- September 2016
- August 2016
- July 2016
- June 2016
- May 2016
- April 2016
- March 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- February 2013
- January 2013
- November 2012
- October 2012
- September 2012
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
Category Archives: Power
Precise Engineering Results in Minimal Downtime During Outage
Barnhart was recently hired to remove and replace two feedwater heaters at a power plant in Kansas during a planned outage. But it wasn’t going to be easy. The project, which was featured in Cranes Today, had a number of … Continue reading →
Posted in Power
|
Tagged Barnhart, feedwater heaters, outage planning, powered saddle roller, pull up jacks, Slide System
|
Leave a comment
NEW KENTUCKY BRANCH OPENS TO BETTER SERVE CUSTOMERS
Barnhart has opened a second location in Kentucky with a new facility in Calvert City, joining Owensboro in the Bluegrass State. “While we have been providing crane and rigging services and heavy transportation in the Calvert City area for many … Continue reading →
Posted in Chemical, Power
|
Tagged Calvert City Kentucky, cantilever beam, chemical industry, gantries, power industry, slide systems
|
Leave a comment
Barnhart to Provide Crane Service During Port Expansion
The show will go on at the Tulsa Port of Catoosa due to an agreement with Barnhart to provide high-capacity crane service for a limited time while the Port Authority upgrades its current crane as part of a multi-million dollar … Continue reading →
Posted in Power, Project Cargo Logistics
|
Tagged Barnhart, Barnhart Crane, Heavy Lift Cranes, port logistics, power plants
|
Leave a comment
Game Goes On Thanks to Barnhart
To kick off the upcoming football season, we share this Barnhart classic video** that captures the thrill of victory. In the middle of a successful University of Texas football season, Barnhart was tasked with delivering and setting power generation components … Continue reading →
Posted in Power
|
Tagged Barnhart Crane, modular lift tower, Power Generation, University of Texas
|
Leave a comment
Thousand-Mile Trip Takes Less Than Three Minutes
Barnhart was hired to move a water runner over 1,1000 miles from New Orleans to a hydroelectric facility in Ludington, Michigan. The piece measured 28’ 2” in circumference, was 15’ tall and weighed over 610,000 lbs. The project was captured … Continue reading →
Posted in Heavy Haul, Power
|
Tagged Barnhart, deck barge, hopper barge, hydroelectric power, water runner
|
Leave a comment
GEARBOX REMOVAL POSES UNUSUAL CHALLENGE
Barnhart was contracted to provide turnkey service for the removal and replacement of five wind turbine gearboxes on 80m hub height wind turbines. The site had several constraints in that the Bureau of Land Management owned the land on which … Continue reading →
BARNHART WINS THREE SC&RA JOB OF THE YEAR AWARDS
Barnhart took home three of seven SC&RA Job of the Year Awards at the SC&RA Annual Conference April 14-18 at the La Costa Resort & Spa in Carlsbad, California. The awards recognize projects that successfully meet professional challenges in rigging … Continue reading →
Posted in Awards, Heavy Haul, Nuclear Power, Power
|
Tagged Barnhart, Heavy Hauling, nuclear power, rigging, SC&RA, SCRA Job of the Year, wind power
|
Leave a comment
430-TON GENERATOR TILT TAKES SECONDS
Barnhart was tasked with engineering and executing the up-ending and down-ending of a 430-ton generator. The team successfully completed the task despite the low head room and only ½” of clearance in the floor opening. See how they did it … Continue reading →
Posted in Power
|
Tagged Barnart Crane, generator, heavy lifting, Power Generation, power plants
|
Leave a comment
VIDEO CASE STUDY: NUCLEAR POWER PLANT OUTAGE
Barnhart was hired by a Wisconsin nuclear power plant to remove and replace four feedwater heaters, a condensate cooler, and two main feed pump motor skids during a spring outage. They then repeated the process in a fall outage in … Continue reading →
Posted in Nuclear Power, Power
|
Tagged Barnhart, Barnhart Crane, nuclear feed water replacement, nuclear feedwater heaters, outage planning, outage support, outages
|
Leave a comment
REDUCING COST THROUGH BETTER PLANNING ON YOUR NEXT OUTAGE
The old saying “time is money” is never more true than with turnarounds, shutdowns and outages requiring cranes and other specialized equipment. The need to reduce cost through better planning is where Barnhart’s national network of branches, people, and deep … Continue reading →
Posted in Nuclear Power, Power
|
Tagged Crane Service, nuclear power, outage planning, Power Generation, Refinery, rigging, shutdowns, turnarounds
|
Leave a comment