Power
Precise Engineering Results in Minimal Downtime During Outage
Barnhart was recently hired to remove and replace two feedwater heaters at a power plant in Kansas during a planned outage. But…
NEW KENTUCKY BRANCH OPENS TO BETTER SERVE CUSTOMERS
Barnhart has opened a second location in Kentucky with a new facility in Calvert City, joining Owensboro in the Bluegrass State. “While…
Barnhart to Provide Crane Service During Port Expansion
The show will go on at the Tulsa Port of Catoosa due to an agreement with Barnhart to provide high-capacity crane service…
Game Goes On Thanks to Barnhart
To kick off the upcoming football season, we share this Barnhart classic video** that captures the thrill of victory. In the middle…
Thousand-Mile Trip Takes Less Than Three Minutes
Barnhart was hired to move a water runner over 1,1000 miles from New Orleans to a hydroelectric facility in Ludington, Michigan. The…
GEARBOX REMOVAL POSES UNUSUAL CHALLENGE
Barnhart was contracted to provide turnkey service for the removal and replacement of five wind turbine gearboxes on 80m hub height wind…
BARNHART WINS THREE SC&RA JOB OF THE YEAR AWARDS
Barnhart took home three of seven SC&RA Job of the Year Awards at the SC&RA Annual Conference April 14-18 at the La…
430-TON GENERATOR TILT TAKES SECONDS
Barnhart was tasked with engineering and executing the up-ending and down-ending of a 430-ton generator. The team successfully completed the task despite…
VIDEO CASE STUDY: NUCLEAR POWER PLANT OUTAGE
Barnhart was hired by a Wisconsin nuclear power plant to remove and replace four feedwater heaters, a condensate cooler, and two main…
REDUCING COST THROUGH BETTER PLANNING ON YOUR NEXT OUTAGE
The old saying “time is money” is never more true than with turnarounds, shutdowns and outages requiring cranes and other specialized equipment. …