The Barnhart Modular Lift Tower (MLT) is a custom-designed alternate lifting method that is a reinvention of heavy lift technology. The pin connected nodal design offers ease of erection without any bolted connection. The innovative design and use of advanced computer modeling technology has produced a tower system that is stable to 250' (75m) without guy wires, improving erection time and reducing site impact. The MLT may be configured to meet the site-specific needs of the project, including such features as lifting and tailing the vessel as shown in this project. Other features include:
Pull Up Gantry
Learn MoreMoveable Counterweight
Learn MoreAir Skates
Learn MoreStandard Cantilever Configuration
Learn MorePowered Saddle Rollers
Learn MoreTip Stick
Learn MoreTemporary Trunnions
Learn MoreHydraulic Gantry
Learn MoreTri-Block
Learn MoreStrand Jacks
Learn MoreModular Lift Tower
Learn MoreHydraulic Turntable
Learn MoreHydraulic Skidding System
Learn MoreVersaLift
Learn MoreTwinlift
Learn More