SHORT NOTICE NO PROBLEM ON R & R JOB

R & R projects, the remove and replace variety, are often challenging, time-sensitive jobs performed during turnarounds and outages. These are the kinds of projects we relish. During a turnaround at a refinery in California, Barnhart was given little notice on … Continue reading

Posted in R & R, Refinery | Tagged , , , , , | Leave a comment

INNOVATIVE LIFT ALLOWS PROJECT TO PROCEED SAFELY

Barnhart was hired to devise an innovative lift system for a rigging project at a nuclear plant in Louisiana. The process was outlined in a recent article in Cranes Today. One of the plant’s two 35-year-old clarifiers was taken offline … Continue reading

Posted in Heavy Lift, Nuclear Power | Tagged , , , , , , | Leave a comment

AN UNPREDICTABLE FINALE TO AN EPIC GAME

For most of the game during Super Bowl 51 on Sunday, victory for the Atlanta Falcons seemed assured. Despite having won four previous Super Bowl titles and being three-point favorites, the New England Patriots were behind at halftime 21-3. By … Continue reading

Posted in Heavy Haul, Heavy Lift, Project Cargo Logistics | Tagged , , , , | Leave a comment

“BICYCLE CHAIN” RIGGING HARD TO BEAT

The adjustable rigging link system (ARLS) is a cool tool in Barnhart’s equipment arsenal. The ARLS is unique to the industry and offers some big advantages. Used primarily for high-capacity loads, the system resembles a large bicycle chain. The length of … Continue reading

Posted in Heavy Lift | Tagged , , , , , , | Leave a comment

EARLY PLANNING SHORTENS PLANT’S OUTAGE SCHEDULE

Work during outages and shutdowns requires proper planning, management, and innovative solutions to keep overall costs down. A job Barnhart performed at a nuclear power plant exemplifies those standards. Barnhart was hired to remove and replace two feedwater heaters (FWH) … Continue reading

Posted in Nuclear Power, Outages | Tagged , , , , , , , | Leave a comment

Gate Removal Project Goes Off Without a Hitch

Barnhart recently performed a project at the Armistead I. Selden Lock and Dam on the Black Warrior River to provide the lifting systems for removing and replacing two 60-year-old downstream miter gates. The gates were 61’ wide x 46’ tall … Continue reading

Posted in Heavy Lift | Tagged , , , , , | Leave a comment

FALL SAFETY FOR ALL SEASONS

It’s fitting that during this season of football, colorful leaves and crisp breezes, we also focus on the kind of fall that can be dangerous. In this industry, and others, it’s common for our teams to work on projects far … Continue reading

Posted in Safety | Tagged , , | Leave a comment

BARNHART NAMED A TOP 50 SPECIALTY CONTRACTOR

The Engineering News Record (ENR) recently announced their list of the Top 600 Specialty Contractors in the nation according to revenue. Barnhart cracked the top 50 for the first time, coming at #48. According to the ENR announcement, the construction … Continue reading

Posted in Awards | Tagged , , , | Leave a comment

CRANE PERFORMS CRITICAL ROLE IN SULLY STORY

Clint Eastwood’s latest movie, “Sully,” follows the story of the legendary pilot Capt. Chesley B. “Sully” Sullenberger and his successful landing of a crippled U.S. Airways plane in the frigid waters of the Hudson River in January 2009. The masterful … Continue reading

Posted in Heavy Lift | Tagged , , , , , | Leave a comment

BARNHART PLAYS A PART IN COLLEGE FOOTBALL SPECTACLE ON SATURDAY

When the Virginia Tech Hokies take the field against the University of Tennessee Volunteers in the Pilot Flying J Battle of Bristol this Saturday, Sept. 10, in Bristol, Tenn., several records are likely to be shattered. The game, which will … Continue reading

Posted in Heavy Lift, News | Tagged , , , , , , | Leave a comment