Condenser Installation

A customer in Connecticut needed to have a sync condenser installed in a building. Before work began, Barnhart had to set up gear inside the building in a tight space. The sync condenser base was offloaded with a 200 ton Demag crane to a light slide track outside of the overhead door.

The cooler was set on top of the condenser base and then the whole unit was slid on the track into the building, using Barnhart's custom designs and fabricated light slide track.

The entire unit was lifted with pull up gantries and set onto the customer's skid plate. The Barnhart team then had to remove their equipment after the piece was set. Despite weather and delays in delivery of the pieces, the job was completed safely and efficiently. It was a great example of successful coordination between the customer and Barnhart's Middletown branch and use of their local equipment assets.