Category Archives: Outages

PRECISION ON DISPLAY IN STATOR PROJECT

A project to remove and replace a 1,073,000 pound stator was recently featured in the May issue of American Cranes and Transport. What made this project notable was the precise calculations and testing that went into making the project a success. … Continue reading

Posted in Nuclear Power, Outages | Tagged , , , , | Leave a comment

How to Make Shutdowns, Turnarounds and Outages Successful

The old saying, “time is money,” is never more true than with shutdowns, turnarounds and outages (STOs) requiring cranes and other specialized equipment. Barnhart has extensive experience in this kind of work, so we’ve learned a thing or two and … Continue reading

Posted in Outages | Tagged , , | Leave a comment

EARLY PLANNING SHORTENS PLANT’S OUTAGE SCHEDULE

Work during outages and shutdowns requires proper planning, management, and innovative solutions to keep overall costs down. A job Barnhart performed at a nuclear power plant exemplifies those standards. Barnhart was hired to remove and replace two feedwater heaters (FWH) … Continue reading

Posted in Nuclear Power, Outages | Tagged , , , , , , , | Leave a comment