Refinery
BARNHART NAVIGATES TIGHT SQUEEZE AT A REFINERY
A refinery in Ohio had a problem. A 50-foot-long electrical shelter building had to be transported from one side of the plant…
Turnaround Expertise on Display in Refinery Project
Barnhart has years of experience in successfully performing projects for customers during outages and turnarounds. So when we were hired to remove…
PROJECTS RESULT IN TWO JOB OF THE YEAR AWARDS
Creative thinking and extensive planning resulted in two 2017 Job of the Year awards for Barnhart from the Specialized Crane and Rigging…
MIDWEST BRANCHES ONE-STOP SHOPS
Barnhart’s 32 branches are located all across the country. They include a string of Midwest locations stretching from Chicago to Lincoln, Nebraska…
SHORT NOTICE NO PROBLEM ON R & R JOB
R & R projects, the remove and replace variety, are often challenging, time-sensitive jobs performed during turnarounds and outages. These are the kinds…
VALVE REMOVAL UTILIZES CANTILEVER SYSTEM
During a turnaround at a refinery in Illinois, Barnhart had to devise a solution for removing and reinstalling an upper delta valve…
Barnhart Engineers Provide Solutions for Drum Removal
At a recent job at a refinery in Illinois, Barnhart faced a challenge when removing and replacing a preflash tower reflux accumulator,…
EXCHANGER BUNDLE REPLACEMENT DURING TURNAROUND A CHALLENGE FOR BARNHART
During a spring turnaround at a petroleum refinery in Illinois, Barnhart was asked to remove and replace eight heat exchanger bundles. Four…
ICY WATERS PRESENT A CHALLENGE TO BARNHART
Barnhart prides itself on keeping jobs on schedule, but sometimes Mother Nature trumps all our careful planning. Such was the case recently…