Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport

Projects & Case Studies· Specialized Transport ·Nuclear

0 Views

When every second counts, Barnhart delivers.

Barnhart was called in to transport a massive 600,000 lb transformer to a nuclear power plant near New Orleans after a previous provider failed to secure permits—putting the project on critical hold. Within a tight timeline, Barnhart's team conducted a detailed route survey, secured the necessary permits, and deployed its proprietary 24 Dolly Rig, engineered in-house for high maneuverability and permit success.

This custom rig features a high strength-to-weight ratio, designed to navigate challenging infrastructure, uneven terrain, and tight corridors—making it ideal for emergency heavy hauls like this one.

From permit problem to project completion, Barnhart's early involvement and innovative solutions helped lower costs and restore critical operations.

Location: New Orleans, Louisiana Equipment Used: 24 Dolly Rig – Designed & Built by Barnhart Industry: Nuclear Power / Heavy Haul / Emergency Response

Video Library Home

Other Videos in Specialized Transport

80,000 Pound Kiln Installation Project

View

Alternate Approach: One-Lift Vessel Removal

View

Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator

View

Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project

View

Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge

View

Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project

View

Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project

View

Safe and Efficient Rooftop Unit Installation

View

Smarter Dryer Replacement Inside a Tight Paper Mill Layout

View

Start to Finish: 200-Ton Caisson Transport

View

Successful Completion of Industrial Mining Project During Time Sensitive Outage

View

Using a Custom Lifting Beam to Replace Transformer Radiators

View

Barnhart’s Knoxville Team Delivers Big

View

135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics

View

160-Foot Conveyor Lift and Set | Barnhart Project Spotlight

View

Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge

View

Barnhart’s Big Lift: Semiconductor Mega-Project

View

Barnhart’s 380K lbs Generator Transport Across 1,800 Miles

View

Inside the Move: 400,000 Pounds of Engineering Precision

View

Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry

View

Taking Down Giants at a Pulp & Paper Mill

View

Barnhart's Temporary Overhead Crane System: Fast, Flexible, and Built for Safety

View

Heavyweight Champion: Barnhart’s 900-Ton Gantry Debut

View

Setting 20 Steel Bridge Girders Over I-55

View

The Barnhart Lift Table - Precise and Powerful Lifting

View

The Barnhart Push Up Unit System in Action

View

"So let's see what 36 axles and a million pounds looks like..."

View

Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport

View

Completing Remove & Replace Days Ahead of Schedule with Custom Engineering

View

Going the Distance: Transporting International Cargo Over 1,100 Miles

View

Hauling a Huge Rotor Through Small Town Streets

View

Hauling and Setting Multi-Story Refinery Modules

View

Heaviest Cargo Ever Moved Across Mobile Bay

View

How We Simplify Super Heavy Transport - Project Cargo Logistics

View

If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station

View

Italy to Illinois: Transport and Installation of Four Texas Towers

View

Massive Coils Travel 49,000+ Accident-Free Miles

View

Moving 100+ Ton Components Two Stories High and Ahead of Schedule

View

Transport Over Rivers and Roads, Turbine Haul and Installation

View

Transporting a Massive Component Through a Snowy Minnesota Town

View

Turnkey Solutions for Project Cargo

View

Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport

View