In a scheduled shutdown at a steel mill in Indiana, Barnhart was called in to install a 63,000 lb. base plate and a 100,000 lb. steel coil positioner despite tight overhead constraints and crane limitations across two adjoining buildings.
With no clear way to lift and place the massive components using the plant’s existing equipment, Barnhart brought in a custom-engineered tip stick and a 550-ton crane to navigate the job’s spatial challenges. The result? A precisely executed lift under tight clearance and within the plant’s limited outage window.
80,000 Pound Kiln Installation Project
View
Alternate Approach: One-Lift Vessel Removal
View
Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator
View
Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project
View
Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge
View
Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project
View
Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project
View
Safe and Efficient Rooftop Unit Installation
View
Smarter Dryer Replacement Inside a Tight Paper Mill Layout
View
Start to Finish: 200-Ton Caisson Transport
View
Successful Completion of Industrial Mining Project During Time Sensitive Outage
View
Using a Custom Lifting Beam to Replace Transformer Radiators
View
Barnhart’s Knoxville Team Delivers Big
View
135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics
View
160-Foot Conveyor Lift and Set | Barnhart Project Spotlight
View
Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge
View
Barnhart’s Big Lift: Semiconductor Mega-Project
View
Barnhart’s 380K lbs Generator Transport Across 1,800 Miles
View
Inside the Move: 400,000 Pounds of Engineering Precision
View
Advantages of a Cantilevered Approach - Webinar
View
Advantages of Laser Scanning in Project Planning
View
Alternative Solutions Introducing the Softrac - Webinar
View
Crane Considerations in Bridge Building - Webinar
View
Floor Loading Considerations - Webinar
View
Hydraulic Gantries 101 - Webinar
View
Hydraulic Jacking Solutions - Webinar
View
Hydraulic Platform Trailer Considerations - Webinar
View
Hydroelectric Remove and Replace - Webinar
View
Installation Methods for Package Boilers - Webinar
View
International Project Logistics -Webinar
View
Load Testing - Webinar
View
Modular Structures for Rigging and Shoring - Webinar
View
Nuclear Feedwater Heater Bundle Remove & Replace – Challenges and Successes - Webianr
View
Outrigger Loads & Ground Bearing Pressure - Webinar
View
Over-the-Road Heavy Haul Considerations - Webinar
View
Overhead Cranes - Webinar
View
Principles of Rigging Stability - Webinar
View
Project Cargo Barging and Rail Considerations - Webinar
View
Proof Testing & Mock-Up Services - Webinar
View
Removing Valves, Pumps, & Motors in Tight Confines - Webinar
View
Rigging with Temporary Attachment - Webinar
View
Single Crane for Blade and Bearing Replacements - Webinar
View
Single Crane Tailing Methods - Webinar
View
Steel and Aluminum Industry Projects - Webinar
View
The Value of a Load Handling Plan - Webinar
View
Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs
View
Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway
View
Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters
View
Finding the Best Approach to Replace Stacked Heat Exchangers
View
Innovative Engineering: Heat Exchanger Replacement Completed in One Shift
View
Installing the World's Largest Four-Sided Video Screen
View
Intricate Removal Process of a Nuclear Steam Dryer
View
Kiln Swap in Tight Quarters
View
More Than Movers and Lifters: Advanced Planning and Engineering
View
Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator
View
Smart Planning, Safe Execution: Industrial Screener Swap in California
View
Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement
View
The Importance of Planning: Project Planning Saves Valuable Time
View
Tight Airspace, Big Lift: Setting HVAC Units
View
When Access is Tight, MOCCS Delivers: Pipe Replacement Project
View
Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry
View
Combining Systems to Move Hard-to-Reach Parts
View
Precision Tilt of 430-Ton Power Generator in Tight Clearance
View
10 Components Moved, 4 Days Saved — Nuclear Success Story
View
Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost
View
How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule
View
Innovative Approach for Converter Removal and Replacement
View
Innovative Motor Removal with Limited Clearance
View
Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment
View
"So let's see what 36 axles and a million pounds looks like..."
View
Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport
View
Completing Remove & Replace Days Ahead of Schedule with Custom Engineering
View
Going the Distance: Transporting International Cargo Over 1,100 Miles
View
Hauling a Huge Rotor Through Small Town Streets
View
Hauling and Setting Multi-Story Refinery Modules
View
Heaviest Cargo Ever Moved Across Mobile Bay
View
How We Simplify Super Heavy Transport - Project Cargo Logistics
View
If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station
View
Italy to Illinois: Transport and Installation of Four Texas Towers
View
Massive Coils Travel 49,000+ Accident-Free Miles
View
Moving 100+ Ton Components Two Stories High and Ahead of Schedule
View
Transport Over Rivers and Roads, Turbine Haul and Installation
View
Transporting a Massive Component Through a Snowy Minnesota Town
View
Turnkey Solutions for Project Cargo
View
Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport
View