Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment

Projects & Case Studies· Remove and Replace ·Nuclear

0 Views

At a Mississippi nuclear station, Barnhart played a critical role in a major plant uprate project — managing the lift, transport, and handling of over 19 million pounds of equipment to support a power increase.

Key components replaced included:

Main transformers

Feedwater heaters

Reactor feed pumps

Generator and turbine components

All retired equipment was safely relocated to an on-site mausoleum storage facility.

To meet the demanding schedule, Barnhart ran parallel operations with 150+ crew members and coordinated over 300 trucks for mobilization. A dedicated logistics team managed field crews and subcontractors, while custom tools were fabricated and delivered as needed.

Despite the scale and complexity, Barnhart improved timelines across every scope — a result of outstanding planning, engineering, and execution in the field.

Video Library Home

Other Videos in Remove and Replace

341,000 Pound Turret Bearing Swap

View

80,000 Pound Kiln Installation Project

View

Alternate Approach: One-Lift Vessel Removal

View

Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator

View

Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project

View

Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge

View

Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project

View

Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project

View

Safe and Efficient Rooftop Unit Installation

View

Single Blade Bearing Swap at 265 Feet

View

Smarter Dryer Replacement Inside a Tight Paper Mill Layout

View

Start to Finish: 200-Ton Caisson Transport

View

Successful Completion of Industrial Mining Project During Time Sensitive Outage

View

Using a Custom Lifting Beam to Replace Transformer Radiators

View

Barnhart’s Knoxville Team Delivers Big

View

Mega MOCCS in Action: Heat Exchanger Remove & Replace

View

135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics

View

160-Foot Conveyor Lift and Set | Barnhart Project Spotlight

View

Lifting the Rawlings Gold Glove

View

Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge

View

Transformer on the Move: 146-Mile Heavy Haul

View

Barnhart’s Big Lift: Semiconductor Mega-Project

View

245,000 LB Power Plant Motor Moved with Precision

View

Barnhart’s 380K lbs Generator Transport Across 1,800 Miles

View

Inside the Move: 400,000 Pounds of Engineering Precision

View

Massive Tower on the Move: Demethanizer Haul

View

Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs

View

Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway

View

Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters

View

Finding the Best Approach to Replace Stacked Heat Exchangers

View

Innovative Engineering: Heat Exchanger Replacement Completed in One Shift

View

Installing the World's Largest Four-Sided Video Screen

View

Intricate Removal Process of a Nuclear Steam Dryer

View

Kiln Swap in Tight Quarters

View

More Than Movers and Lifters: Advanced Planning and Engineering

View

Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator

View

Smart Planning, Safe Execution: Industrial Screener Swap in California

View

Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement

View

The Importance of Planning: Project Planning Saves Valuable Time

View

Tight Airspace, Big Lift: Setting HVAC Units

View

When Access is Tight, MOCCS Delivers: Pipe Replacement Project

View

Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry

View

Combining Systems to Move Hard-to-Reach Parts

View

Precision Tilt of 430-Ton Power Generator in Tight Clearance

View

Company Overview

View

The Value of Remove & Replace

View

10 Components Moved, 4 Days Saved — Nuclear Success Story

View

Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost

View

How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule

View

Innovative Approach for Converter Removal and Replacement

View

Innovative Motor Removal with Limited Clearance

View

Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment

View

"So let's see what 36 axles and a million pounds looks like..."

View

Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport

View

Completing Remove & Replace Days Ahead of Schedule with Custom Engineering

View

Going the Distance: Transporting International Cargo Over 1,100 Miles

View

Hauling a Huge Rotor Through Small Town Streets

View

Hauling and Setting Multi-Story Refinery Modules

View

Heaviest Cargo Ever Moved Across Mobile Bay

View

How We Simplify Super Heavy Transport - Project Cargo Logistics

View

If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station

View

Italy to Illinois: Transport and Installation of Four Texas Towers

View

Massive Coils Travel 49,000+ Accident-Free Miles

View

Moving 100+ Ton Components Two Stories High and Ahead of Schedule

View

Transport Over Rivers and Roads, Turbine Haul and Installation

View

Transporting a Massive Component Through a Snowy Minnesota Town

View

Turnkey Solutions for Project Cargo

View

Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport

View