Tight space. Big challenge. Smarter solution.
In this Illinois project, Barnhart was tasked with removing and replacing a ball mill buried deep inside a building, without the space for a conventional gantry or the costly delays of roof removal.
While others proposed cutting into the roof and using a large crane, Barnhart engineered a cleaner approach: remove just one wall section and use a triple-wide Goldhofer PSTE platform trailer and cribbing to carefully maneuver the mill out. It was a tight squeeze, but precise planning and equipment made it possible.
80,000 Pound Kiln Installation Project
View
Alternate Approach: One-Lift Vessel Removal
View
Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator
View
Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project
View
Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge
View
Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project
View
Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project
View
Safe and Efficient Rooftop Unit Installation
View
Smarter Dryer Replacement Inside a Tight Paper Mill Layout
View
Start to Finish: 200-Ton Caisson Transport
View
Successful Completion of Industrial Mining Project During Time Sensitive Outage
View
Using a Custom Lifting Beam to Replace Transformer Radiators
View
Barnhart’s Knoxville Team Delivers Big
View
135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics
View
160-Foot Conveyor Lift and Set | Barnhart Project Spotlight
View
Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge
View
Barnhart’s Big Lift: Semiconductor Mega-Project
View
Barnhart’s 380K lbs Generator Transport Across 1,800 Miles
View
Inside the Move: 400,000 Pounds of Engineering Precision
View
Advantages of a Cantilevered Approach - Webinar
View
Advantages of Laser Scanning in Project Planning
View
Alternative Solutions Introducing the Softrac - Webinar
View
Crane Considerations in Bridge Building - Webinar
View
Floor Loading Considerations - Webinar
View
Hydraulic Gantries 101 - Webinar
View
Hydraulic Jacking Solutions - Webinar
View
Hydraulic Platform Trailer Considerations - Webinar
View
Hydroelectric Remove and Replace - Webinar
View
Installation Methods for Package Boilers - Webinar
View
International Project Logistics -Webinar
View
Load Testing - Webinar
View
Modular Structures for Rigging and Shoring - Webinar
View
Nuclear Feedwater Heater Bundle Remove & Replace – Challenges and Successes - Webianr
View
Outrigger Loads & Ground Bearing Pressure - Webinar
View
Over-the-Road Heavy Haul Considerations - Webinar
View
Overhead Cranes - Webinar
View
Principles of Rigging Stability - Webinar
View
Project Cargo Barging and Rail Considerations - Webinar
View
Proof Testing & Mock-Up Services - Webinar
View
Removing Valves, Pumps, & Motors in Tight Confines - Webinar
View
Rigging with Temporary Attachment - Webinar
View
Single Crane for Blade and Bearing Replacements - Webinar
View
Single Crane Tailing Methods - Webinar
View
Steel and Aluminum Industry Projects - Webinar
View
The Value of a Load Handling Plan - Webinar
View
Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs
View
Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway
View
Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters
View
Finding the Best Approach to Replace Stacked Heat Exchangers
View
Innovative Engineering: Heat Exchanger Replacement Completed in One Shift
View
Installing the World's Largest Four-Sided Video Screen
View
Intricate Removal Process of a Nuclear Steam Dryer
View
Kiln Swap in Tight Quarters
View
More Than Movers and Lifters: Advanced Planning and Engineering
View
Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator
View
Smart Planning, Safe Execution: Industrial Screener Swap in California
View
Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement
View
The Importance of Planning: Project Planning Saves Valuable Time
View
Tight Airspace, Big Lift: Setting HVAC Units
View
When Access is Tight, MOCCS Delivers: Pipe Replacement Project
View
Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry
View
Combining Systems to Move Hard-to-Reach Parts
View
Precision Tilt of 430-Ton Power Generator in Tight Clearance
View
10 Components Moved, 4 Days Saved — Nuclear Success Story
View
Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost
View
How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule
View
Innovative Approach for Converter Removal and Replacement
View
Innovative Motor Removal with Limited Clearance
View
Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment
View
"So let's see what 36 axles and a million pounds looks like..."
View
Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport
View
Completing Remove & Replace Days Ahead of Schedule with Custom Engineering
View
Going the Distance: Transporting International Cargo Over 1,100 Miles
View
Hauling a Huge Rotor Through Small Town Streets
View
Hauling and Setting Multi-Story Refinery Modules
View
Heaviest Cargo Ever Moved Across Mobile Bay
View
How We Simplify Super Heavy Transport - Project Cargo Logistics
View
If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station
View
Italy to Illinois: Transport and Installation of Four Texas Towers
View
Massive Coils Travel 49,000+ Accident-Free Miles
View
Moving 100+ Ton Components Two Stories High and Ahead of Schedule
View
Transport Over Rivers and Roads, Turbine Haul and Installation
View
Transporting a Massive Component Through a Snowy Minnesota Town
View
Turnkey Solutions for Project Cargo
View
Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport
View