Slide System

February 26, 2018

Precise Engineering Results in Minimal Downtime During Outage

Barnhart was recently hired to remove and replace two feedwater heaters at a power plant in Kansas during a planned outage. But…

Read More…

June 8, 2017

Cool Tools and Planning Make Dryer Installation Successful

Barnhart specializes in remove and replace projects. We enjoy the challenge involved in safely extricating a component, which is often buried in a…

Read More…

February 10, 2017

AN UNPREDICTABLE FINALE TO AN EPIC GAME

For most of the game during Super Bowl 51 on Sunday, victory for the Atlanta Falcons seemed assured. Despite having won four…

Read More…

January 12, 2017

EARLY PLANNING SHORTENS PLANT’S OUTAGE SCHEDULE

Work during outages and shutdowns requires proper planning, management, and innovative solutions to keep overall costs down. A job Barnhart performed at…

Read More…

December 8, 2016

Gate Removal Project Goes Off Without a Hitch

Barnhart recently performed a project at the Armistead I. Selden Lock and Dam on the Black Warrior River to provide the lifting…

Read More…

June 13, 2016

Barnhart Engineers Provide Solutions for Drum Removal

At a recent job at a refinery in Illinois, Barnhart faced a challenge when removing and replacing a preflash tower reflux accumulator,…

Read More…

May 25, 2016

TIGHT SCHEDULE AND OBSTACLES CHALLENGE BARNHART TEAM

Time is money during an outage, so the clock was ticking for a Barnhart project at a steel mill in Alabama. Barnhart…

Read More…

May 10, 2016

CREATIVITY KEY TO JOB OF THE YEAR AWARDS FOR BARNHART

Barnhart was honored with two “Job of the Year” awards in the categories of “Rigging Job $750,000 – $2 Million” and “Rigging…

Read More…

July 6, 2011

Frigid Temperatures For Feedwater Heater Replacement

Market: Nuclear Location: Illinois Project Dates: 02/11 The Challenge A customer contracted Barnhart to remove and replace three nuclear feedwater heaters in…

Read More…