Slide System
Precise Engineering Results in Minimal Downtime During Outage
Barnhart was recently hired to remove and replace two feedwater heaters at a power plant in Kansas during a planned outage. But…
Cool Tools and Planning Make Dryer Installation Successful
Barnhart specializes in remove and replace projects. We enjoy the challenge involved in safely extricating a component, which is often buried in a…
AN UNPREDICTABLE FINALE TO AN EPIC GAME
For most of the game during Super Bowl 51 on Sunday, victory for the Atlanta Falcons seemed assured. Despite having won four…
EARLY PLANNING SHORTENS PLANT’S OUTAGE SCHEDULE
Work during outages and shutdowns requires proper planning, management, and innovative solutions to keep overall costs down. A job Barnhart performed at…
Gate Removal Project Goes Off Without a Hitch
Barnhart recently performed a project at the Armistead I. Selden Lock and Dam on the Black Warrior River to provide the lifting…
Barnhart Engineers Provide Solutions for Drum Removal
At a recent job at a refinery in Illinois, Barnhart faced a challenge when removing and replacing a preflash tower reflux accumulator,…
TIGHT SCHEDULE AND OBSTACLES CHALLENGE BARNHART TEAM
Time is money during an outage, so the clock was ticking for a Barnhart project at a steel mill in Alabama. Barnhart…
CREATIVITY KEY TO JOB OF THE YEAR AWARDS FOR BARNHART
Barnhart was honored with two “Job of the Year” awards in the categories of “Rigging Job $750,000 – $2 Million” and “Rigging…
Frigid Temperatures For Feedwater Heater Replacement
Market: Nuclear Location: Illinois Project Dates: 02/11 The Challenge A customer contracted Barnhart to remove and replace three nuclear feedwater heaters in…