At an aluminum plant in Foley, Alabama, Barnhart was tasked with removing and replacing a 150,000 lb., 50-year-old motor—a critical component for the facility’s operations.
A traditional approach would have required a massive crane and costly roof modifications, significantly extending the outage schedule. Instead, Barnhart delivered a smarter solution.
After laser scanning the area, our team engineered a custom system using a hydraulic platform trailer and a rotating gantry mounted with a girder and moving counterweight. This setup allowed the team to reach over, lift, and extract the motor components through an alleyway—without disrupting the roof structure.
The same system was then used to install the new motor, safely and efficiently. The counterweight atop the girder dynamically adjusted the center of gravity, providing stability throughout the lift.
Another example of how Barnhart delivers innovative solutions that reduce downtime, cut costs, and solve complex challenges in tight spaces.
80,000 Pound Kiln Installation Project
View
Alternate Approach: One-Lift Vessel Removal
View
Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator
View
Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project
View
Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge
View
Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project
View
Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project
View
Safe and Efficient Rooftop Unit Installation
View
Smarter Dryer Replacement Inside a Tight Paper Mill Layout
View
Start to Finish: 200-Ton Caisson Transport
View
Successful Completion of Industrial Mining Project During Time Sensitive Outage
View
Using a Custom Lifting Beam to Replace Transformer Radiators
View
Barnhart’s Knoxville Team Delivers Big
View
135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics
View
160-Foot Conveyor Lift and Set | Barnhart Project Spotlight
View
Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge
View
Barnhart’s Big Lift: Semiconductor Mega-Project
View
Barnhart’s 380K lbs Generator Transport Across 1,800 Miles
View
Inside the Move: 400,000 Pounds of Engineering Precision
View
Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs
View
Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway
View
Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters
View
Finding the Best Approach to Replace Stacked Heat Exchangers
View
Innovative Engineering: Heat Exchanger Replacement Completed in One Shift
View
Installing the World's Largest Four-Sided Video Screen
View
Intricate Removal Process of a Nuclear Steam Dryer
View
Kiln Swap in Tight Quarters
View
More Than Movers and Lifters: Advanced Planning and Engineering
View
Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator
View
Smart Planning, Safe Execution: Industrial Screener Swap in California
View
Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement
View
The Importance of Planning: Project Planning Saves Valuable Time
View
Tight Airspace, Big Lift: Setting HVAC Units
View
When Access is Tight, MOCCS Delivers: Pipe Replacement Project
View
Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry
View
Combining Systems to Move Hard-to-Reach Parts
View
Precision Tilt of 430-Ton Power Generator in Tight Clearance
View
10 Components Moved, 4 Days Saved — Nuclear Success Story
View
Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost
View
How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule
View
Innovative Approach for Converter Removal and Replacement
View
Innovative Motor Removal with Limited Clearance
View
Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment
View
"So let's see what 36 axles and a million pounds looks like..."
View
Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport
View
Completing Remove & Replace Days Ahead of Schedule with Custom Engineering
View
Going the Distance: Transporting International Cargo Over 1,100 Miles
View
Hauling a Huge Rotor Through Small Town Streets
View
Hauling and Setting Multi-Story Refinery Modules
View
Heaviest Cargo Ever Moved Across Mobile Bay
View
How We Simplify Super Heavy Transport - Project Cargo Logistics
View
If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station
View
Italy to Illinois: Transport and Installation of Four Texas Towers
View
Massive Coils Travel 49,000+ Accident-Free Miles
View
Moving 100+ Ton Components Two Stories High and Ahead of Schedule
View
Transport Over Rivers and Roads, Turbine Haul and Installation
View
Transporting a Massive Component Through a Snowy Minnesota Town
View
Turnkey Solutions for Project Cargo
View
Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport
View