At a Mississippi nuclear station, Barnhart played a critical role in a major plant uprate project — managing the lift, transport, and handling of over 19 million pounds of equipment to support a power increase.

Key components replaced included:

Main transformers

Feedwater heaters

Reactor feed pumps

Generator and turbine components

All retired equipment was safely relocated to an on-site mausoleum storage facility.

To meet the demanding schedule, Barnhart ran parallel operations with 150+ crew members and coordinated over 300 trucks for mobilization. A dedicated logistics team managed field crews and subcontractors, while custom tools were fabricated and delivered as needed.

Despite the scale and complexity, Barnhart improved timelines across every scope — a result of outstanding planning, engineering, and execution in the field.

Video Library Home

Other Videos in Remove and Replace

80,000 Pound Kiln Installation Project

View

Alternate Approach: One-Lift Vessel Removal

View

Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator

View

Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project

View

Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge

View

Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project

View

Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project

View

Safe and Efficient Rooftop Unit Installation

View

Smarter Dryer Replacement Inside a Tight Paper Mill Layout

View

Start to Finish: 200-Ton Caisson Transport

View

Successful Completion of Industrial Mining Project During Time Sensitive Outage

View

Using a Custom Lifting Beam to Replace Transformer Radiators

View

Barnhart’s Knoxville Team Delivers Big

View

135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics

View

160-Foot Conveyor Lift and Set | Barnhart Project Spotlight

View

Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge

View

Barnhart’s Big Lift: Semiconductor Mega-Project

View

Barnhart’s 380K lbs Generator Transport Across 1,800 Miles

View

Inside the Move: 400,000 Pounds of Engineering Precision

View

Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs

View

Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway

View

Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters

View

Finding the Best Approach to Replace Stacked Heat Exchangers

View

Innovative Engineering: Heat Exchanger Replacement Completed in One Shift

View

Installing the World's Largest Four-Sided Video Screen

View

Intricate Removal Process of a Nuclear Steam Dryer

View

Kiln Swap in Tight Quarters

View

More Than Movers and Lifters: Advanced Planning and Engineering

View

Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator

View

Smart Planning, Safe Execution: Industrial Screener Swap in California

View

Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement

View

The Importance of Planning: Project Planning Saves Valuable Time

View

Tight Airspace, Big Lift: Setting HVAC Units

View

When Access is Tight, MOCCS Delivers: Pipe Replacement Project

View

Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry

View

Combining Systems to Move Hard-to-Reach Parts

View

Precision Tilt of 430-Ton Power Generator in Tight Clearance

View

10 Components Moved, 4 Days Saved — Nuclear Success Story

View

Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost

View

How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule

View

Innovative Approach for Converter Removal and Replacement

View

Innovative Motor Removal with Limited Clearance

View

Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment

View

"So let's see what 36 axles and a million pounds looks like..."

View

Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport

View

Completing Remove & Replace Days Ahead of Schedule with Custom Engineering

View

Going the Distance: Transporting International Cargo Over 1,100 Miles

View

Hauling a Huge Rotor Through Small Town Streets

View

Hauling and Setting Multi-Story Refinery Modules

View

Heaviest Cargo Ever Moved Across Mobile Bay

View

How We Simplify Super Heavy Transport - Project Cargo Logistics

View

If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station

View

Italy to Illinois: Transport and Installation of Four Texas Towers

View

Massive Coils Travel 49,000+ Accident-Free Miles

View

Moving 100+ Ton Components Two Stories High and Ahead of Schedule

View

Transport Over Rivers and Roads, Turbine Haul and Installation

View

Transporting a Massive Component Through a Snowy Minnesota Town

View

Turnkey Solutions for Project Cargo

View

Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport

View