Skip to main content

Video Library

Mega MOCCS in Action: Heat Exchanger Remove & Replace

View

Transformer on the Move: 146-Mile Heavy Haul

View

245,000 LB Power Plant Motor Moved with Precision

View

160-Foot Conveyor Lift and Set | Barnhart Project Spotlight

View

135-Foot Ship Lift | Barnhart Heavy Lift Cranes Barge Loading & Marine Logistics

View

Inside the Move: 400,000 Pounds of Engineering Precision

View

Barnhart’s Big Lift: Semiconductor Mega-Project

View

Custom Tools and Strand Jacks: Solving a Nuclear Outage Challenge

View

Barnhart’s Knoxville Team Delivers Big

View

Kiln Swap in Tight Quarters

View

Taking Down Giants at a Pulp & Paper Mill

View

Barnhart’s 380K lbs Generator Transport Across 1,800 Miles

View

Massive Coils Travel 49,000+ Accident-Free Miles

View

Tight Airspace, Big Lift: Setting HVAC Units

View

Heavyweight Champion: Barnhart’s 900-Ton Gantry Debut

View

Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport

View

Innovative Motor Removal with Limited Clearance

View

Heaviest Cargo Ever Moved Across Mobile Bay

View

Setting 20 Steel Bridge Girders Over I-55

View

Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs

View

How We Simplify Super Heavy Transport - Project Cargo Logistics

View

Precision Tilt of 430-Ton Power Generator in Tight Clearance

View

10 Components Moved, 4 Days Saved — Nuclear Success Story

View

Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement

View

If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station

View

Hauling and Setting Multi-Story Refinery Modules

View

Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters

View

Jack, Slide, and Rig 53,000 Pounds: Deaerator Removal Project

View

Smarter Dryer Replacement Inside a Tight Paper Mill Layout

View

The Importance of Planning: Project Planning Saves Valuable Time

View

Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator

View

500 Ton Slide System: Rotor Separation Project

View

Innovative Approach for Converter Removal and Replacement

View

80,000 Pound Kiln Installation Project

View

Successful Completion of Industrial Mining Project During Time Sensitive Outage

View

Finding the Best Approach to Replace Stacked Heat Exchangers

View

Non-Conventional Approach to Indiana Ball Mill Removal and Replacement Project

View

Problems Arise: Crafting Solutions During a Successful Steel Mill Installation Project

View

Cost Effective Approach to Up-Ending and Down-Ending a Power Plant Generator

View

Using a Custom Lifting Beam to Replace Transformer Radiators

View

Completing Remove & Replace Days Ahead of Schedule with Custom Engineering

View

Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment

View

Intricate Removal Process of a Nuclear Steam Dryer

View

Movable Counterweight: An Efficient Solution for a Heat Exchanger Shell Replacement Project

View

Smart Planning, Safe Execution: Industrial Screener Swap in California

View

Innovative Engineering: Heat Exchanger Replacement Completed in One Shift

View

Cutting Cost, Saving Time: Inside a Stabilizer Vessel Replacement Project

View

Alternate Approach: One-Lift Vessel Removal

View

Turnkey Solutions for Project Cargo

View

Going the Distance: Transporting International Cargo Over 1,100 Miles

View

Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport

View

Transport Over Rivers and Roads, Turbine Haul and Installation

View

Installing the World's Largest Four-Sided Video Screen

View

Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway

View

Tri-Block Rotation and Reactor Component Transport Across State Lines

View

Transporting a Massive Component Through a Snowy Minnesota Town

View

Barnhart’s Blade Bar: Single-Crane Solution for Wind Turbine Blade Removal

View

Hauling a Huge Rotor Through Small Town Streets

View

Removing a Wind Turbine Blade with a Single Crane System

View

Softrac Weaving Long Cargo Through Narrow Corridors

View

More Than Movers and Lifters: Advanced Planning and Engineering

View

Innovative Solutions for Removing Hard to Reach Equipment

View

Removing Heavy, Obstructed Parts within Tight Clearance with the MOCCS

View

Combining Systems to Move Hard-to-Reach Parts

View

How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule

View

Restacking a 430 Ton Generator On-Site: Tailling Beam & Telescoping Hydraulic Gantry

View

Italy to Illinois: Transport and Installation of Four Texas Towers

View

Barnhart’s Mega MOCCS: High-Capacity Cantilever Lifting for Confined Spaces

View

Using the Mega MOCCS for Mega Lifts

View

Mini-MOCCS: Barnhart’s Innovative Cantilever Tool for Efficient Rigging

View

When Access is Tight, MOCCS Delivers: Pipe Replacement Project

View

Barnhart's Temporary Overhead Crane System: Fast, Flexible, and Built for Safety

View

"So let's see what 36 axles and a million pounds looks like..."

View

Moving 100+ Ton Components Two Stories High and Ahead of Schedule

View

Start to Finish: 200-Ton Caisson Transport

View

Lifting 45' Long Tanks with a Single Crane and Custom Spreader Bars

View

The Barnhart Lift Table - Precise and Powerful Lifting

View

Barnhart Modular Lift Tower: Redefining Heavy Lifts with Smarter, Safer Solutions

View

Safe and Efficient Rooftop Unit Installation

View

Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost

View

Lifting & Setting a 200 Ton Concrete Cap on a Historic Span Bridge

View

The Barnhart Push Up Unit System in Action

View

Alternative Solutions Introducing the Softrac - Webinar

View

Single Crane Tailing Methods - Webinar

View

Principles of Rigging Stability - Webinar

View

Crane Considerations in Bridge Building - Webinar

View

Over-the-Road Heavy Haul Considerations - Webinar

View

Nuclear Feedwater Heater Bundle Remove & Replace – Challenges and Successes - Webianr

View

Outrigger Loads & Ground Bearing Pressure - Webinar

View

Rigging with Temporary Attachment - Webinar

View

Hydraulic Gantries 101 - Webinar

View

Installation Methods for Package Boilers - Webinar

View

Single Crane for Blade and Bearing Replacements - Webinar

View

Hydraulic Platform Trailer Considerations - Webinar

View

Steel and Aluminum Industry Projects - Webinar

View

Advantages of Laser Scanning in Project Planning

View

Hydraulic Jacking Solutions - Webinar

View

Project Cargo Barging and Rail Considerations - Webinar

View

Overhead Cranes - Webinar

View

Floor Loading Considerations - Webinar

View

Removing Valves, Pumps, & Motors in Tight Confines - Webinar

View

The Value of a Load Handling Plan - Webinar

View

Proof Testing & Mock-Up Services - Webinar

View

Advantages of a Cantilevered Approach - Webinar

View

Modular Structures for Rigging and Shoring - Webinar

View

Hydroelectric Remove and Replace - Webinar

View

International Project Logistics -Webinar

View

Load Testing - Webinar

View