Mega MOCCS in Action: Heat Exchanger Remove & Replace
View
Transformer on the Move: 146-Mile Heavy Haul
View
245,000 LB Power Plant Motor Moved with Precision
View
Kiln Swap in Tight Quarters
View
Taking Down Giants at a Pulp & Paper Mill
View
Massive Coils Travel 49,000+ Accident-Free Miles
View
Tight Airspace, Big Lift: Setting HVAC Units
View
Using Custom Solutions for Over the Road Transport | Barnhart Heavy Transport
View
Innovative Motor Removal with Limited Clearance
View
Heaviest Cargo Ever Moved Across Mobile Bay
View
Barnhart Data Center Tools: Safer, Faster Solutions for Complex Installs
View
How We Simplify Super Heavy Transport - Project Cargo Logistics
View
Tackling Unplanned Delays with Innovative Solutions: Nuclear Reactor Head Replacement
View
If There's a Will, There's a Way: Transporting Oversized Loads at a Nuclear Power Station
View
Hauling and Setting Multi-Story Refinery Modules
View
Designing a Cost Effective Solution for Installing Nuclear Feedwater Heaters
View
Jack, Slide, and Rig 53,000 Pounds: Deaerator Removal Project
View
The Importance of Planning: Project Planning Saves Valuable Time
View
Safely Tackle Tight Deadlines: Innovative Approach to Offloanding 5,000 Lb Generator
View
500 Ton Slide System: Rotor Separation Project
View
Innovative Approach for Converter Removal and Replacement
View
Finding the Best Approach to Replace Stacked Heat Exchangers
View
Completing Remove & Replace Days Ahead of Schedule with Custom Engineering
View
Nuclear Plant Power Increase - Efficient Removal and Replacement of Equipment
View
Intricate Removal Process of a Nuclear Steam Dryer
View
Movable Counterweight: An Efficient Solution for a Heat Exchanger Shell Replacement Project
View
Smart Planning, Safe Execution: Industrial Screener Swap in California
View
Innovative Engineering: Heat Exchanger Replacement Completed in One Shift
View
Turnkey Solutions for Project Cargo
View
Going the Distance: Transporting International Cargo Over 1,100 Miles
View
Barnhart’s Goldhofer Platform Trailers: Modular Power for Heavy Transport
View
Transport Over Rivers and Roads, Turbine Haul and Installation
View
Installing the World's Largest Four-Sided Video Screen
View
Building the Ultimate Video Display: A 750-Ton Project at Bristol Motor Speedway
View
Tri-Block Rotation and Reactor Component Transport Across State Lines
View
Transporting a Massive Component Through a Snowy Minnesota Town
View
Barnhart’s Blade Bar: Single-Crane Solution for Wind Turbine Blade Removal
View
Hauling a Huge Rotor Through Small Town Streets
View
Removing a Wind Turbine Blade with a Single Crane System
View
Softrac Weaving Long Cargo Through Narrow Corridors
View
More Than Movers and Lifters: Advanced Planning and Engineering
View
Innovative Solutions for Removing Hard to Reach Equipment
View
Removing Heavy, Obstructed Parts within Tight Clearance with the MOCCS
View
How Barnhart Removed and Replaced a 58' Deaerator Ahead of Schedule
View
Italy to Illinois: Transport and Installation of Four Texas Towers
View
Barnhart’s Mega MOCCS: High-Capacity Cantilever Lifting for Confined Spaces
View
Using the Mega MOCCS for Mega Lifts
View
Mini-MOCCS: Barnhart’s Innovative Cantilever Tool for Efficient Rigging
View
When Access is Tight, MOCCS Delivers: Pipe Replacement Project
View
"So let's see what 36 axles and a million pounds looks like..."
View
Moving 100+ Ton Components Two Stories High and Ahead of Schedule
View
Lifting 45' Long Tanks with a Single Crane and Custom Spreader Bars
View
Barnhart Modular Lift Tower: Redefining Heavy Lifts with Smarter, Safer Solutions
View
Critical Motor Remove & Replace with Drastically Reduced Downtime and Cost
View
Alternative Solutions Introducing the Softrac - Webinar
View
Single Crane Tailing Methods - Webinar
View
Principles of Rigging Stability - Webinar
View
Crane Considerations in Bridge Building - Webinar
View
Over-the-Road Heavy Haul Considerations - Webinar
View
Nuclear Feedwater Heater Bundle Remove & Replace – Challenges and Successes - Webianr
View
Outrigger Loads & Ground Bearing Pressure - Webinar
View
Rigging with Temporary Attachment - Webinar
View
Hydraulic Gantries 101 - Webinar
View
Installation Methods for Package Boilers - Webinar
View
Single Crane for Blade and Bearing Replacements - Webinar
View
Hydraulic Platform Trailer Considerations - Webinar
View
Steel and Aluminum Industry Projects - Webinar
View
Advantages of Laser Scanning in Project Planning
View
Hydraulic Jacking Solutions - Webinar
View
Project Cargo Barging and Rail Considerations - Webinar
View
Overhead Cranes - Webinar
View
Floor Loading Considerations - Webinar
View
Removing Valves, Pumps, & Motors in Tight Confines - Webinar
View
The Value of a Load Handling Plan - Webinar
View
Proof Testing & Mock-Up Services - Webinar
View
Advantages of a Cantilevered Approach - Webinar
View
Modular Structures for Rigging and Shoring - Webinar
View
Hydroelectric Remove and Replace - Webinar
View
International Project Logistics -Webinar
View
Load Testing - Webinar
View