Refinery
BARNHART NAVIGATES TIGHT SQUEEZE AT A REFINERY
A refinery in Ohio had a problem. A 50-foot-long electrical shelter building had to be transported from one side of the plant…
Turnaround Expertise on Display in Refinery Project
Barnhart has years of experience in successfully performing projects for customers during outages and turnarounds. So when we were hired to remove…
Heavy Load Turns Heads in Tulsa
Last week, Barnhart’s heavy haul of a massive piece of equipment drew onlookers along the route in Oklahoma. The 317,000 lbs. unit,…
VIDEO LIBRARY SHOWCASES SOME OF BARNHART’S BEST
While Barnhart performs and documents jobs of all sizes, the massive projects involving large equipment and oversize components are often hard to…
SHORT NOTICE NO PROBLEM ON R & R JOB
R & R projects, the remove and replace variety, are often challenging, time-sensitive jobs performed during turnarounds and outages. These are the kinds…
VALVE REMOVAL UTILIZES CANTILEVER SYSTEM
During a turnaround at a refinery in Illinois, Barnhart had to devise a solution for removing and reinstalling an upper delta valve…
Barnhart Engineers Provide Solutions for Drum Removal
At a recent job at a refinery in Illinois, Barnhart faced a challenge when removing and replacing a preflash tower reflux accumulator,…
REDUCING COST THROUGH BETTER PLANNING ON YOUR NEXT OUTAGE
The old saying “time is money” is never more true than with turnarounds, shutdowns and outages requiring cranes and other specialized equipment. …
ICY WATERS PRESENT A CHALLENGE TO BARNHART
Barnhart prides itself on keeping jobs on schedule, but sometimes Mother Nature trumps all our careful planning. Such was the case recently…